资源受限多项目调度的混合遗传算法 被引量:23

Hybrid genetic algorithm for resource constrained multi-project scheduling problem
在线阅读 下载PDF
导出
摘要 针对资源受限多项目调度问题,提出了改进后的混合遗传算法.该算法基于串行进度生成机制,结合多项目任务列表与项目优先权设计了新的染色体,所设计的交叉算子与变异算子均能保证所得新个体满足项目紧前关系约束,从而有效提高算法搜索效率.算法充分利用不同启发式算法构造初始种群,有效扩大种群多样性以避免过早收敛.算法采用正向逆向调度技术对调度方案进行优化,进一步提高了调度方案的质量.与其他多项目调度启发式算法相比,该算法能有效分配资源,显著缩短项目平均总工期. A new hybrid genetic algorithm was proposed to solve the resource constrained multi-project scheduling problem. The algorithm utilized the serial schedule generation scheme to construct project schedules. A new chromosome was designed integrating the multi-project activity list and individual project priorities. Genetic operators, including crossover and mutation operators, ensured the next generation individuals are always precedence feasible, thus significantly accelerated the searching speed of the algorithm. A variety of heuristics and priority rules were employed to generate the original population so as to increase population diversity and avoid early constringency. A forward-backward scheduling technique was also integrated to improve the schedule quality. Results show that the algorithm can effectively allocate constraint resources to achieve a shorter overall multi-project duration.
出处 《浙江大学学报(工学版)》 EI CAS CSCD 北大核心 2009年第1期23-27,共5页 Journal of Zhejiang University:Engineering Science
基金 国家自然科学基金资助项目(70401017)
关键词 遗传算法 项目调度 资源约束 genetic algorithm project scheduling resource constraint
  • 相关文献

参考文献10

  • 1LOVA A, TORMOS P. Combining random sampling and backward-forward heuristics for resource-constrained multi-project scheduling [C]//Proceedings of the 8th International Workshop on Project Management and Scheduling. Valencia, Spain:[s. n. ], 2002 : 244 - 248.
  • 2KUMANAN S, JEGAN J G, RAJA K. Multi-project scheduling using an heuristic and a genetic algorithm [J]. The International Journal of Advanced Manufacturing Technology, 2006, 31(3-4): 360-366.
  • 3GONCALVES J F, MENDES J J M, RESENDE M G C. A genetic algorithm for the resource constrained multi-project scheduling problem[J]. European Journal of Operational Research, 2008, 189(3) : 1171 - 1190.
  • 4SPRECHER A, KOLISCH R, DREXL A. Semi-active, active, and non-delay schedules for the resourceconstrained project scheduling problem [J].European Journal of Operational Research, 1995, 80(1) : 94 - 102.
  • 5KURTULUS I, DAVIS E W. Multi-project scheduling: categorization of heuristic rules performance[J].Management Science, 1982, 28(2):161 - 172.
  • 6HARTMANN S. A competitive genetic algorithm for resource-constrained project scheduling[J]. Naval Research Logistics, 1998, 45(7) : 733 - 750.
  • 7LI K Y, WILLIS R J. An iterative scheduling technique for resource-constrained project scheduling[J]. European Journal of Operational Research, 1992, 56(3): 370-379.
  • 8寿涌毅.资源约束下多项目调度的迭代算法[J].浙江大学学报(工学版),2004,38(8):1095-1099. 被引量:48
  • 9TSAI D M, CHIU H N. Two heuristics for scheduling multiple projects with resource constraints[J]. Construction Management and Economies, 1996, 14(4):325- 340.
  • 10KURTULUS I, NARULA S C. Multi-project scheduling: analysis of project performance [J].IIE Transactions, 1985, 17(1): 58-66.

二级参考文献9

  • 1TURNER J R. The handbook of project-Based management [M]. London: McGraw-Hill, 1993.
  • 2KURTULUS I, DAVIS E W. Multi-project scheduling:Categorization of heuristic rules performance[J]. Management Science, 1982, 28(2): 161 - 172.
  • 3TSAI D M, CHIU H N. Two heuristics for scheduling multiple projects with resource constraints [J]. Construction Management and Economics, 1996, 14:325 -340.
  • 4SPRECHER A, KOLISCH R, DREXL A. Semi-active,active, and non-delay schedules for the resource-constrained project scheduling problem[J]. European Journal of Operational Research, 1995, 80: 94 - 102.
  • 5LI K Y, WILLIS R J. An iterative scheduling technique for resource-constrained project scheduling[J]. European Journal of Operational Research, 1992, 56: 370-379.
  • 6OZDAMAR L, ULUSOY G. A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis [J]. European Journal of Operational Research, 1996, 89: 400- 407.
  • 7TORMOS P,LOVA A. An efficient multi-pass heuristic for project scheduling with constrained resources[J].International Journal of Production Research, 2003, 41(5):1071-1086.
  • 8毛义华.网络优化技术在工程索赔管理中的应用[J].浙江大学学报(自然科学版),2000,34(4):453-458. 被引量:3
  • 9廖仁,陈庆新,等.资源约束下多项目调度的启发式算法[J].管理工程学报,2002,16(B10):100-103. 被引量:22

共引文献47

同被引文献244

引证文献23

二级引证文献137

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部