7LOVA A, TORMOS P. Combining random sampling and backward-forward heuristics for resource-constrained multi-project scheduling [C]//Proceedings of the 8th International Workshop on Project Management and Scheduling. Valencia, Spain:[s. n. ], 2002 : 244 - 248.
8KUMANAN S, JEGAN J G, RAJA K. Multi-project scheduling using an heuristic and a genetic algorithm [J]. The International Journal of Advanced Manufacturing Technology, 2006, 31(3-4): 360-366.
9GONCALVES J F, MENDES J J M, RESENDE M G C. A genetic algorithm for the resource constrained multi-project scheduling problem[J]. European Journal of Operational Research, 2008, 189(3) : 1171 - 1190.
10SPRECHER A, KOLISCH R, DREXL A. Semi-active, active, and non-delay schedules for the resourceconstrained project scheduling problem [J].European Journal of Operational Research, 1995, 80(1) : 94 - 102.