并行工程项目调度的组合随机抽样算法 被引量:5

Composite random sampling algorithm for scheduling concurrent projects
在线阅读 下载PDF
导出
摘要 为了克服传统的基于任务优先规则的启发式算法的局限性,提高并行工程项目的资源配置效率和缩短项目工期,提出了一种基于串行进度生成机制的组合随机抽样算法.该算法拓展了单项目串行进度生成机制,并引入基于后悔值的随机函数,组合不同的任务优先规则,对并行项目的各任务进行重复随机抽样,从而选择最好的进度计划.经系统算例检验表明,该算法能够有效优化并行项目的资源配置,从而显著缩短项目工期. In order to overcome the shortcoming of traditional priority rule based heuristics, a new composite random sampling method based on serial schedule generation scheme was proposed to increase the effectiveness of resource allocation and shorten the overall project durations. The method extends the serial schedule generation scheme used in single project scheduling to multi-project scheduling problems. Using the regret-based biased random sampling technique, the method combines various priority rules to schedule a set of simultaneous projects repetitively, so as to select the best multi-project schedule. Systematic experimental tests show that the proposed composite random sampling method improves the resource allocation among project activities and significantly shortens the overall project durations.
作者 寿涌毅
出处 《浙江大学学报(工学版)》 EI CAS CSCD 北大核心 2006年第2期344-347,共4页 Journal of Zhejiang University:Engineering Science
基金 国家自然科学基金资助项目(70401017)
关键词 项目调度 资源约束 随机抽样 project scheduling resource constraint random sampling
  • 相关文献

参考文献11

  • 1KURTULUS I,DAVIS E W.Multi-project scheduling:Categorization of heuristic rules performance[J].Management Science,1982,28(2):161-172.
  • 2BOWERS M R,GROOM K,MORRIS R.A practical application of a multi-project scheduling heuristic[J].Production and Inventory Management Journal,1996,37(4):19-25.
  • 3KARA S,KAYIS B,KAEBERNICK H.Concurrent resource allocation(CRA):A heuristic for multi-project scheduling with resource constraints in concurrent engineering[J].Concurrent Engineering:Research and Applications,2001,9(1):64-73.
  • 4KURTULUS I,NARULA S C.Multi-project scheduling:Analysis of project performance[J].IIE Transactions,1985,17(1):58-66.
  • 5LAWRENCE S R,MORTON T E.Resource-constrained multi-project scheduling with tardy costs:Comparing myopic,bottleneck,and resource pricing heuristics[J].European Journal of Operational Research,1993,64(2):168-187.
  • 6TSAI D M,CHIU H N.Two heuristics for scheduling multiple projects with resource constraints[J].Construction Management and Economics,1996,14(4):325-340.
  • 7SPRECHER A,KOLISCH R,DREXL A.Semi-active,active,and non-delay schedules for the resourceconstrained project scheduling problem[J].European Journal of Operational Research,1995,80:94-102.
  • 8KOLISCH R,DREXL A.Adaptive search for solving hard project scheduling problems[J].Naval Research Logistics,1996,43:23-40.
  • 9SCHIRMER A,RIESENBERG S.Parameterized heuristics for project scheduling-Biased random sampling methods[R].Kiel:Kiel University,1997.
  • 10PATTERSON J H.A comparison of exact approaches for solving the multiple constrained resource,project scheduling problem[J].Management Science,1984,30(7):854-867.

二级参考文献9

  • 1TURNER J R. The handbook of project-Based management [M]. London: McGraw-Hill, 1993.
  • 2KURTULUS I, DAVIS E W. Multi-project scheduling:Categorization of heuristic rules performance[J]. Management Science, 1982, 28(2): 161 - 172.
  • 3TSAI D M, CHIU H N. Two heuristics for scheduling multiple projects with resource constraints [J]. Construction Management and Economics, 1996, 14:325 -340.
  • 4SPRECHER A, KOLISCH R, DREXL A. Semi-active,active, and non-delay schedules for the resource-constrained project scheduling problem[J]. European Journal of Operational Research, 1995, 80: 94 - 102.
  • 5LI K Y, WILLIS R J. An iterative scheduling technique for resource-constrained project scheduling[J]. European Journal of Operational Research, 1992, 56: 370-379.
  • 6OZDAMAR L, ULUSOY G. A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis [J]. European Journal of Operational Research, 1996, 89: 400- 407.
  • 7TORMOS P,LOVA A. An efficient multi-pass heuristic for project scheduling with constrained resources[J].International Journal of Production Research, 2003, 41(5):1071-1086.
  • 8毛义华.网络优化技术在工程索赔管理中的应用[J].浙江大学学报(自然科学版),2000,34(4):453-458. 被引量:3
  • 9廖仁,陈庆新,等.资源约束下多项目调度的启发式算法[J].管理工程学报,2002,16(B10):100-103. 被引量:22

共引文献47

同被引文献101

引证文献5

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部