摘要 正定新区全地下污水处理厂工程采用了MBR工艺,详细介绍了其工艺设计、平面与竖向设计、结构设计、消防设计、除臭设计、投资及运行成本。该工程用地指标仅为0.42 m^2/m^3,出水指标全部稳定达标。其设计经验可供其他类似工程参考。 The MBR process was adopted in the underground sewage treatment plant in Zhengding New District. The process design, horizontal and vertical design, structural design, fire safety design, deodorization design as well as investment and running cost were discussed. The land index of the project was only 0.42 m^2/m^3. All the effluent indexes could meet the discharge standards. The design experi- ence can provide reference for similar projects.
作者 刘绪为 徐洁 林蔓 李彤 张英旭 张雷 于中海 LIU Xu-wei XU Jie LIN Man LI Tong ZHANG Ying-xu YU Zhong-hai ZHANG Lei(North China Municipal Engineering Design and Research Institute Co. Ltd., Tianfin 300381, China)
出处 《中国给水排水》 CAS CSCD 北大核心 2017年第4期48-50,共3页 China Water & Wastewater
关键词 全地下污水处理厂 MBR 工艺设计 underground sewage treatment plant MBR process design
  • 相关文献

参考文献5

二级参考文献13

共引文献61

同被引文献79

引证文献9

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部