摘要
针对漏板不同步升温造成的危害,研究了漏板同步自动升温的程序设计。分析了主程序与单块漏板控制程序的运行,对比了热漏板与新漏板升温过程,完成升温速率的计算,对单块漏板控制程序进行是否与主程序建立链接和断开链接的计算,以及升温完成后执行恒温控制。
With regard to the harm of asynchronous heating-up of bushings, the programming for automatic synchro- nous heating-up of bushings was researched on the basis of the analysis on the operations of the master program and the single bushing control program, the comparison of the heating-up processes of hot bushings and new bushings, the calculation of heating-up rate and, for the single link with the master program. bushing control program, the calculation for the link or out-of-
出处
《玻璃纤维》
CAS
2013年第2期20-24,共5页
Fiber Glass
关键词
池窑拉丝
漏板
自动同步升温
程序设计
direct-meh process for fiber drawing
bushing
automatic synchronous heating-up
programming