期刊文献+

装配线多技能作业人员优化配置模型 被引量:10

Mixed-skill worker assignment optimization model for assembly line
原文传递
导出
摘要 人员配置是影响装配生产效率的重要因素。针对装配人员岗位能力描述问题,提出了岗位适应度的概念,以技能等级和给定时间段内人员执行装配作业的累计时间为参数对岗位适应度进行描述,建立了以人员岗位适应度最大和装配线各工位之间作业人员岗位适应度差异最小为目标的装配线人员优化配置模型,设计了一种基于岗位适应度矩阵的启发式求解算法,通过举例分析验证了方法的可行性。 Worker assignment is one of the key factors which influence the productivity of assembly line. The concept of post fitness is presented for the description of the competency of assembly workers. The post fitness which takes the operator skill level and accumulated assembling time as parameters is formulated. An optimization model for assembly worker assignment is constructed,and the objectives are maximizing the post fitness for each assembly station and minimizing the difference of post fitness among operators working in the same assembly line. A heuristic algorithm based on the fitness matrix is presented. An example is presented for illustration and the results suggest that the approach is feasible.
出处 《重庆大学学报(自然科学版)》 EI CAS CSCD 北大核心 2010年第12期21-26,共6页 Journal of Chongqing University
基金 国家自然科学基金重点项目(51035001) 中央高校基本科研业务费资助项目(CDJZR10110015) 重庆市自然科学基金资助项目(CSTC2010BB9212)
关键词 装配线 配置 模型 优化 算法 assembly line assignment model optimization algorithms
  • 相关文献

参考文献14

  • 1BUZACOTT J A. The impact of worker differences on production system output[J]. International Journal of Production Economics, 2002, 78 (1): 37-44.
  • 2ALFARES H K. Survey, categorization, and comparison of recent tour scheduling literature [J]. Annals of Operations Research, 2004, 127 (1/4) : 145-175.
  • 3BEDDOE G R, PETROVIC S. Selecting and weighting features using a genetic algorithm in a case-based reasoning approach to personnel fostering [ J ]. European Journal of Operational Research, 2006, 175 (2): 649-671.
  • 4CEVIKCAN E, DURMUSOGLU M B, UNAL M E. A team-oriented design methodology for mixed model assembly systems [J]. Computers & Industrial Engineering, 2009, 56(2) : 576-599.
  • 5ERNST A T. Staff scheduling and rostering: a review of applications, methods and models[J]. European Journal of Operational Research, 2004, 153(1): 3-27.
  • 6RAGOTTE M J. The effect of human operator variability on the throughput of an AGV system. A case study: general motors car assembly plant - door AGV system [D]. Canada: University of Waterloo, 1990.
  • 7SABAR M B, MONTREUIL M F. Competency and preference based personnel scheduling in large assembly lines [J]. International Journal of Computer Integrated Manufacturing, 2008, 21(4): 468- 479.
  • 8COROMINAS A R, PASTOR J P. Balancing assembly line with skilled and unskilled workers[J]. Omega, 2008, 36(6): 1126-1132.
  • 9NAKADE K, NISHIWAKI R. Optimal allocation of heterogeneous workers in a U-shaped production line [J]. Computers & Industrial Engineering, 2008, 54 (3) : 432-440.
  • 10KUO Y, YANG T. Optimization of mixed-skill multiline operator allocation problem [J]. Computers Industrial Engineering, 2007, 53(3): 386-393.

同被引文献65

引证文献10

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部