期刊文献+

乌江梯级水库联合优化调度方案研究 被引量:15

Study of joint operation scheme of Wujiang River cascade reservoirs
在线阅读 下载PDF
导出
摘要 为寻求适合乌江梯级水库群最大发电效益的联合调度方式,对常用的梯级水库联合调度方式、模型建立进行了综合分析,提出以梯级蓄能调度图为指导,辅以水库蓄供水控制线为约束的联合调度方式,并给出了绘制梯级蓄能调度图的方法和步骤。实例分析结果表明,该方法不仅能合理控制水库蓄放水次序和蓄放水量,且调度条件简单,运行灵活,可有效增加梯级总发电效益,具有较好的实际应用前景。 In order to seek suitable joint operation scheme for Wujiang River cascade reservoirs, we analyze the commonly used joint operation scheme and the model establishment of cascade reservoirs comprehensively. It is proposed that the cascade pumped storage graph should be adopted as a guide, while supplemented by restriction of water storage and supply control line of reservoirs. The drawing method and process for cascade pumped storage graph is presented. The analysis of engineering example shows that this reservoir release order and water storage and release amount can be controlled by the method reasonably. The operation conditions of this method are simple and flexible, which can effectively increase total generation benefit of the cascade.
出处 《人民长江》 北大核心 2010年第22期8-11,共4页 Yangtze River
基金 "十一五"国家科技支撑计划项目(2008BAB29B09 2008BAB29B08)
关键词 水库群联合调度 判别系数 蓄放水方式 乌江梯级水库 joint operation of reservoir group judging index water storage and supply method Wujiang River cascade reservoirs
  • 相关文献

参考文献1

共引文献14

同被引文献150

引证文献15

二级引证文献111

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部