三峡水库9月分旬控制蓄水初步研究 被引量:46

Preliminary study on impounding water of Three Gorges Project in September
在线阅读 下载PDF
导出
摘要 三峡水库提前蓄水是充分发挥三峡水库效益的重要课题,而提前蓄水必然会提高三峡大坝的防洪风险,有必要提出一个有效的调度方案解决。本文在分析三峡水库洪水的基础上,提出了9月分旬控制蓄水的方案,针对不同频率的洪水组合进行了调洪演算,得到了9月各旬相应的防洪限制水位,并对其发电效益进行了比较。所得结论可供三峡工程在实际运行中制定调度方案参考。 Ahead impounding water of Three Gorges reservoir is an important problem of getting more benefit of Three Gorges Project(TGP), but it will inevitablely increase the risk of flood control. It is necessary to put forward an effective scheme to meet the flood control requirement. A safety control water level impounding scheme in September is presented based on the analysis of flood frequency and flood detention capacity of the TGP. The safety control water level at dam site is of this study can be used proposed and the corresponding benefit of more power generation is calculated. The results for enactment of the TGP operation scheme.
出处 《水力发电学报》 EI CSCD 北大核心 2006年第1期61-66,共6页 Journal of Hydroelectric Engineering
基金 国家重点基础研究资助项目(2003CB415200)
关键词 水资源 提前蓄水 防洪风险 分旬控制蓄水方案 发电效益 water resource ahead impounding water risk of flood control control impounding scheme benefit of power generation
  • 相关文献

参考文献5

二级参考文献17

  • 1长江科学院.三峡工程175米方案水库泥沙数学模型计算成果分析.三峡工程泥沙问题研究成果汇编[M].水利电力部科学技术司,1988,6..
  • 2长江科学院.三峡工程水库泥沙淤积计算综合分析报告.三峡工程泥沙问题研究成果汇编[M].水利电力部科学技术司,1988,6..
  • 3长江科学院.长江三峡工程泥沙与航运关键技术研究专题研究报告集[M].武汉工业大学出版社,1993..
  • 4水利电力出版社.三峡工程小丛书之三:防洪[M].水利电力出版社,1992..
  • 5洛叙六.三峡水利工程是防洪、能源、交通的战略性工程[J].水电能源科学,1986,4(1):299-305.
  • 6薛世仪.对长江三峡工程综合评价的探讨[J].水电能源科学,1987,5(3):200-202.
  • 7冯尚友.水资源系统工程[M].武汉:湖北科学技术出版社,1997..
  • 8水利电力出版社.三峡工程小从书之三:防洪[M].北京:水利电力出版社,1992..
  • 9Guo Zhongwei(郭仲伟).Risk Analysis and Decision(风险分析与决策)[M].Beijing: Mechanical Industry Press,1987..
  • 10Luo Wensheng(雒文生).River Hydrology (河流水文学)[M].Beijing: Hydraulic and Electric Press,1992..