调峰对锅炉设备和运行技术的要求 被引量:1

The Demands of Partial Loads on the Boiler Equipment and Operation Technology
在线阅读 下载PDF
导出
摘要 金竹山电厂锅炉设计全部燃烧金竹山地区的无烟煤 ,属于国内最难燃烧煤种之一。锅炉按额定负荷设计 ,未考虑调峰要求。通过多年的调峰试验研究和运行实践 ,针对锅炉调峰试验过程中出现的问题 ,相应采取了各项行之有效的技术改造措施 ,使锅炉能同时满足机组的低负荷和两班制调峰的要求。 All the boilers of Jin Zhushan Power Plant are designed to combust the local anthracite which is a kind of coal most difficult to combust. The boilers are designed according to the allowed load without considering the demands of partial loads. Through years' partial loads test study and operating practice,aiming at the problems arising during the tests of partial loads,all kinds of technical reforming measures have been taken to make the boiler meet the needs of both low load of the unit and the partial loads of the daily start stop.
作者 杨继明
机构地区 长沙理工大学
出处 《锅炉技术》 北大核心 2004年第3期59-63,共5页 Boiler Technology
关键词 锅炉 低负荷 两班制调峰 无烟煤 boiler low-load daily start stop anthracite
  • 相关文献

参考文献2

  • 1.金竹山电厂125MW机组调峰技术的研究鉴定资料[R].长 沙:湖南省电力局,1998..
  • 2金维强.大型锅炉运行[M].北京:中国电力出版社,1996..

共引文献5

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部