摘要
参与两班制调峰的机组启动多为热态启动,但存在启动时间长、速度慢、热冲击大等问题。分析了200MW机组热态启动中存在的问题和影响因素,提出了实施200MW机组热态启动的建议和措施,以指导200MW机组两班制调峰运行。
Most cyclic peaking generating units employ hot start,but there exist long start up time,slow process and thermal impulse,etc.,problems.Based upon the analysis of problems existing during the hot start of 200 MW generating units and affecting factors,the proposals and measures of carrying out hot start of 200 MW generating units are put forward to direct cyclic load regulation operation.