摘要
通过西气东输管道工程郑州黄河顶管穿越施工 ,简要介绍了长距离顶管的施工方案。
Through the pile-jacking construction underneath the Yellow River at Zhengzhou of the pipeline project for gas transmission from west to east, this article gives a brief introduction on the construction scheme, construction techniques and engineering economic analysis of the long-distance pile jacking method.
出处
《铁路工程造价管理》
2003年第3期7-10,共4页
Railway Engineering Cost Management