重型机械加工废水处理工程设计与调试运行

Design,commissioning and operation of wastewater treatment project for heavy machinery processing
在线阅读 下载PDF
导出
摘要 某重型机械公司生产过程中主要产生脱脂废水和锆化废水,对脱脂废水采用破乳沉淀和气浮工艺进行除油,对锆化废水采用两级除氟工艺进行除氟,2种废水经预处理后与生活污水混合,再采用MBBR工艺处理。工程调试运行结果表明,系统运行稳定,当进水COD、氨氮、总氮、总磷、氟离子的质量浓度分别为483、49.1、58.3、6.2和38.6 mg/L时,出水COD、氨氮、总氮、总磷、氟离子的质量浓度分别为156、19.7、31.4、1.2和0.98 mg/L。出水水质符合GB/T 31962—2015《污水排入城镇下水道水质标准》中的B级标准,并满足企业内控要求。 In the production process of a heavy machinery manufacturing enterprise,degreasing wastewater and zirconium conversion wastewater are mainly generated.For degreasing wastewater,an emulsion-breaking precipitation and air flotation process was adopted for oil removal;while for zirconium conversion wastewater,a two-stage fluoride removal process was employed for defluoridation.After treatment,the two kinds of wastewater were mixed with domestic sewage and further treated using MBBR process.The commissioning and operation results showed that the system ran stably.When the mass concentrations of COD,ammonia nitrogen,total nitrogen,total phosphorus,and fluoride ions in the influent water were 483,49.1,58.3,6.2,and 38.6 mg/L,respectively,the corresponding indicators in the effluent water were 156,19.7,31.4,1.2,and 0.98 mg/L,respectively.The effluent water quality met the Class B standard specified in GB/T 31962—2015 Wastewater quality standards for discharge to municipal sewers and complied with the enterprise′s internal control standards.
作者 李鑫 王涛 陆鹏飞 LI Xin;WANG Tao;LU Pengfei(Qingdao West Coast Public Control Environmental Protection Group Co.,Ltd.,Qingdao 266400,China)
出处 《工业用水与废水》 2025年第6期82-86,共5页 Industrial Water & Wastewater
关键词 脱脂废水 锆化废水 气浮 除氟 MBBR工艺 degreasing wastewater zirconium conversion wastewater air flotation fluoride removal MBBR process
  • 相关文献

参考文献14

二级参考文献163

共引文献180

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部