摘要 围绕变电站工程中一次设备的安装与调试技术展开分析,首先阐述了一次设备的基本定义与作用,其次从施工流程不规范、设备选型不当及技术交底不足三方面指出当前存在的问题,最后提出针对性的解决策略与技术路径,并附典型设备调试参数表以增强实践指导价值,旨在提升变电站工程建设质量与运行安全性。 This article analyzes the installation and commissioning technology of primary equipment in substation engineering.Firstly,the basic definition and function of primary equipment are elaborated.Secondly,the current problems are pointed out from three aspects:non-standard construction process,improper equipment selection,and insufficient technical disclosure.Finally,targeted solutions and technical paths are proposed,and a typical equipment commissioning parameter table is attached to enhance practical guidance value,aiming to improve the construction quality and operational safety of substation engineering.
作者 闫皓 索文哲 梁长禧 柴瑞 YAN Hao;SUO Wenzhe;LIANG Changxi;CHAI Rui(State Grid Xinjiang Electric Power Co.,Ltd.Ultra High Voltage Branch,Urumqi 830000,China)
出处 《电工技术》 2025年第S1期28-30,共3页 Electric Engineering
关键词 变电站工程 一次设备 安装调试 substation engineering one device installation and commissioning
  • 相关文献

参考文献4

二级参考文献12

共引文献29

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部