期刊文献+

电力工程变电站一次设备安装调试施工技术研究 被引量:4

Research on Construction Technology of Primary Equipment Installation and Debugging of Transformer Substation in Power Engineering
在线阅读 下载PDF
导出
摘要 随着电力系统规模和复杂性的增长,变电站一次设备的安装与调试变得尤为关键,涵盖母线、变压器、断路器等核心设备,其过程必须严格遵守技术规范。智能化技术的引入进一步提升了设备运行的可靠性和安全性。首先,对变电站一次设备安装与调试技术进行了系统研究;其次,分析关键技术并探讨智能化技术的应用前景,以期为电力工程施工质量提升提供科学依据和技术支持。 With the growth of power systems scale and complexity,the installation and commissioning of primary equipment in transformer substations have become particularly critical covering core equipment such as busbars,transformers,and circuit breakers,and the process must strictly comply with technical specifications.The integration of intelligent technologies has further enhanced the reliability and safety of equipment operations.Firstly,a systematically research examines the installation and commissioning technology of primary equipment in transformer substations;Secondly,it analyzes key technologies,and explores the application prospects of intelligent technologies,with the aim of providing scientific basis and technical support for improving the construction quality of power engineering.
作者 张沪杭 ZHANG Huhang(Zhejiang Kangda Construction Co.,Ltd.,Hangzhou,Zhejiang Province,310000 China)
出处 《科技资讯》 2025年第9期91-93,共3页 Science & Technology Information
关键词 电力工程 变电站 一次设备安装调试 施工技术 Power engineering Transformer substation Primary equipment installation and debugging Construction technology
  • 相关文献

参考文献5

二级参考文献17

共引文献31

同被引文献12

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部