摘要
为实现高速铁路接触网的高平顺性、高稳定性,在提前介入阶段开展高速铁路接触网与轨道同步精测精调的探索。在阐述接触网与精测网关系的基础上,分别从关键内容、重要保障、基本方法、必要措施4个方面,探索实现高速铁路接触网与轨道同步精测精调。通过提前介入、全过程控制,为实现接触网动态验收“零缺陷”奠定坚实基础。
In order to achieve high smoothness and high stability of high-speed railway catenary,the exploration of high-speed railway catenary equipment and track synchronous precise measurement and adjustment is carried out in early intervention stage.On the basis of elaborating the relationship between catenary and precise measurement net⁃work,this paper explores the implementation of synchronous precise measurement and adjustment of catenary and track in high-speed railway from four aspects of key contents,important guarantee,basic method and necessary mea⁃sures,and lays a solid foundation for implementing‘zero defect’of dynamic acceptance of catenary through early in⁃tervention and whole process control.
出处
《铁道技术监督》
2020年第7期53-55,59,共4页
Railway Quality Control
关键词
高速铁路
接触网
轨道
精准测量
精细调整
High-speed Railway
Catenary
Track
Precise Measurement
Fine Adjustment