期刊文献+

高速铁路建设提前介入阶段接触网与轨道同步精测精调探索 被引量:4

Exploration on Precise Measurement and Adjustment of Catenary and Track Synchronization in Early Intervention of High-speed Railway
在线阅读 下载PDF
导出
摘要 为实现高速铁路接触网的高平顺性、高稳定性,在提前介入阶段开展高速铁路接触网与轨道同步精测精调的探索。在阐述接触网与精测网关系的基础上,分别从关键内容、重要保障、基本方法、必要措施4个方面,探索实现高速铁路接触网与轨道同步精测精调。通过提前介入、全过程控制,为实现接触网动态验收“零缺陷”奠定坚实基础。 In order to achieve high smoothness and high stability of high-speed railway catenary,the exploration of high-speed railway catenary equipment and track synchronous precise measurement and adjustment is carried out in early intervention stage.On the basis of elaborating the relationship between catenary and precise measurement net⁃work,this paper explores the implementation of synchronous precise measurement and adjustment of catenary and track in high-speed railway from four aspects of key contents,important guarantee,basic method and necessary mea⁃sures,and lays a solid foundation for implementing‘zero defect’of dynamic acceptance of catenary through early in⁃tervention and whole process control.
作者 宋新江 SONG Xinjiang
出处 《铁道技术监督》 2020年第7期53-55,59,共4页 Railway Quality Control
关键词 高速铁路 接触网 轨道 精准测量 精细调整 High-speed Railway Catenary Track Precise Measurement Fine Adjustment
  • 相关文献

参考文献1

二级参考文献5

共引文献8

同被引文献14

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部