摘要
介绍葛洲坝电站机组增容改造原因,重点介绍发电机定子部分的改造,并对施工过程中出现的问题进行分析及处理。
This paper introduces the reasons for the capacity expansion of Gezhouba Hydropower Station, focuses on the modification of the stator part of the generator and analyzes and deals with the problems arising during the construction.
出处
《现代制造技术与装备》
2017年第12期141-142,共2页
Modern Manufacturing Technology and Equipment
关键词
增容改造
定子
基准筋
定位筋
消防水管
compatibilization, stator, reference tendons, positioning tendons, fire hose