摘要
和矿业相配套的基础设施建设是整个生产过程必不可少的支撑,而矿产资源不可避免地会分布在高寒地区,这些地区的土质一般具有软土特性,所以高寒地区矿业生产的基础设施建设尤为重要。以高寒软土矿区地层的填土层、角砾粉土层、砂岩层和角砾层及环境温度为输入变量,采用非线性迭代的方式给出了高寒软土矿区的最优固结时间,为高质量高效率的矿区基础设施建设提供理论依据。
The infrastructure matching with the mine is the necessary support in the whole mine productive process. However, the mineral resources are inevitably distributed in the cold area, and the soil in this area usually has the soft characteristic. Therefore, it is especially important for the infrastructure construction of the mine production in the cold area. Selected the fill stratum, breccia powder soil, sandstone beds, breccia layer and the environment temperature as the input variables, and the optimal consolidation time for the cold and soft mine area is given through the nonlinear iterative method. The proposed method can offer the theoretical basis for the high quality and efficiency infrastructure construction in the mine area.
出处
《煤矿机械》
2017年第5期64-66,共3页
Coal Mine Machinery
关键词
矿区基础设施
高寒软土
最优固结时间
非线性迭代
infrastructure in the mine area
iterative method cold and soft soil
optimal consolidation time
nonlinear