期刊文献+

跨河大桥冰凌模拟试验研究 被引量:8

Experimental study on the ice physical modeling with a spanning river bridge
在线阅读 下载PDF
导出
摘要 冰凌灾害是严重威胁河道防洪及跨河工程的重大问题.由于冰凌问题的复杂性,开展了跨河桥梁冰凌物理模型系列试验.试验结果表明,河段卡冰应具备一定的河床边界条件及水流条件.在来流量400~600m3/s,来冰密度大于50%,河段出现卡冰.桥位卡冰最大水位壅高值与来冰系数ξ存在较好响应关系,当ξ为0.154时,水位壅高值最大. Ice disaster is a serious threat to the flood control and spanning river engineering. Due to the com- plexity of the ice issue, a physical model experiment is conducted to research the ice flow effected by a bridge across the river. The results show that particular boundary and flow condition are required for the formation of the ice jam. In condition of the discharge of 400 - 600 m3/ s with the ice density greater than 50% , the ice jam formed. There is a good relationship between the maximum damming level and the ice coefficientS:. The damming level reaches to the maximum value ,when ξ is equal to 0. 154.
出处 《泥沙研究》 CSCD 北大核心 2014年第4期49-54,共6页 Journal of Sediment Research
基金 黄河水利科学研究院中央级基本科研业务费专项(编号:HKY-JBYW-2013-24)
关键词 跨河桥梁 模拟试验 冰密度 冰塞水位 黄河 across river bridge physical model experiment ice density ice jam stage the Yellow River
  • 相关文献

参考文献21

二级参考文献61

共引文献216

同被引文献53

引证文献8

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部