摘要
佛子岭水库是安徽省 2 0世纪 5 0年代初兴建的大型水利水电工程 ,因原设计时缺少水文资料 ,水库防洪库容太小 ,虽经扩建和加固 ,现有防洪标准仍然很低。为保证水库安全 ,汛期限制水位已几次降低。为做好近期水库运行管理工作 ,根据新变化的情况 ,重新研究了水库群灌溉补偿调度、分期兴利调度等问题 ,对汛期和非汛期蓄水位进行了比较。初步分析结果可为水库近期调度参考 。
In order to correctly conduct recent operation and management of Fuziling Reservoir,based on new variation of circumstances,the problems such as irrigation regulation,utilizable regulation in stages of reservoir system are newly studied,the storage levels in flood and low water periods compared.The preliminary analysis result may be consulted for receut operation of reservoir and also provides basis for adopting new engineering measures.