摘要
结合国华系统内电厂发生RB后出现的问题,以及锦界电厂机组的自身特点,对国华锦界电厂600MW发电机组CCS中RB功能在运行过程中存在的问题进行了详细的分析,提出了改进、优化方案及措施,对结果进行了全面的论证和总结,并对投运效果进行了综合评价。
With the emerging problems after RB in the plants of GUOHUA system, and the own characteristics of the SHANXI GUOHUA JINJIE power plant, the detailed analysis is given during unit operating process. Optimized schemes and measures are proposed; and comprehensive evaluation and summary are concluded. Finally, a comprehensive evaluation for the operation results is given.
出处
《自动化博览》
2014年第1期96-98,共3页
Automation Panorama1
关键词
优化
RB指令
跟踪
锅炉主控
稳定运行
Optimization
RB directive
Tracking
Boiler control
Stableoperation