摘要
本文通过对神华陕西国华锦界能源有限责任公司(以下简称国华锦能公司)4×600MW机组RB控制逻辑设计及现场实际应用情况分析,提出了优化RB控制逻辑的具体方法,并通过现场应用消除了原设计当中存在的安全隐患,对同类厂的RB控制逻辑设计有借鉴意义。
Based on the design and the field application analysis of 4× 600 mw RB logic control of Guohua Jin bounded energy sources company, this paper proposes the specific method for optimizing RB logic control. The field application demonstrates that the method can eliminate the safe trouble hidden in the original design. It is of significance for the RB control logic design of power plants.
出处
《自动化博览》
2011年第4期70-74,共5页
Automation Panorama1
关键词
RB逻辑
协调控制
RB control logic
Coordinated control