4Ahuja H M,Arunachalam V.Risk evaluation in resource allocation[J].Journal of Construction Engineering and Management,ASCE,1984,110(4):324-336.
5Padilla E M,Carr R I.Resource strategies for dynamic project management[J].Journal of Construction Engineering and Management,ASCE,1991,117(2):279 -293.
6Babu A J G,Suresh N.Project management with time,cost,and quality considerations[J].Journal of Operational Research,1996(88):320-327.
7Babu A J G,Suresh N.Project crashing:Modeling and optimization[J].WDSI Conference Proceeding,1994(3):751-755.
8Do Ba Khang,Yin Mon Myint.Time,cost and quality trade-off in project management:A case study[J].International Journal of Project Management,1999,17(4):249-256.