工程项目管理的工期-费用-质量综合优化研究 被引量:52

Study Synthesis Optimization of Time-Cost-Quality in Project Management
原文传递
导出
摘要 将各活动的质量按照与工期假定的线性关系进行量化处理,以0到1之间的任意实数来表征各活动的质量,则整个工程的质量表征为各活动质量的某种函数,连同工期、费用一起建立了三者综合优化的数学模型.同时,对此模型应用遗传算法进行优化求解,最后给出一个实例. Shorter time, lower cost and higher quality of the project is the main aim in project management, while the quality of the project has seldom been referred in theory and application research. Here the quality of each activity is quantitated with the numeral from 0 to 1, which assumed that they were linearity relationship between time and quliaty of the activity. Then the quality of the project is figured out with a certain function of all activity quality. Based on these, the mathematics model of their synthesis optimization is built considering time, cost and quality. The results show that the method is more superior, and the results can be checked in application.
出处 《系统工程理论与实践》 EI CSCD 北大核心 2007年第10期112-117,共6页 Systems Engineering-Theory & Practice
关键词 工期 费用 质量 综合优化 time cost quality synthesis optimization
  • 相关文献

参考文献5

  • 1Ahuja H M,Arunachalam V.Risk evaluation in resource allocation[J].Journal of Construction Engineering and Management,ASCE,1984,110(4):324-336.
  • 2Padilla E M,Carr R I.Resource strategies for dynamic project management[J].Journal of Construction Engineering and Management,ASCE,1991,117(2):279 -293.
  • 3Babu A J G,Suresh N.Project management with time,cost,and quality considerations[J].Journal of Operational Research,1996(88):320-327.
  • 4Babu A J G,Suresh N.Project crashing:Modeling and optimization[J].WDSI Conference Proceeding,1994(3):751-755.
  • 5Do Ba Khang,Yin Mon Myint.Time,cost and quality trade-off in project management:A case study[J].International Journal of Project Management,1999,17(4):249-256.

同被引文献383

引证文献52

二级引证文献213

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部