板坯连铸结晶器冷却水量控制分析 被引量:4

Control of the amount of cooling water for the slab continuous casting mould
在线阅读 下载PDF
导出
摘要 在建立板坯连铸凝固传热模型的基础上,通过模拟涟钢210转炉厂现行和拟调整的结晶器冷却制度,比较不同结晶器冷却水量对板坯质量影响。结果表明,涟钢210转炉厂结晶器弱冷却有下调空间,结晶器冷却水量为4000/380L/min时,铸坯角部裂纹发生率最小。 Based on the mathematical model of heat transfer in the slab continuous casting process,the paper investigates the influence of different amounts of mould cooling water on slab quality by simulating the existing primary cooling system of Lianyuan 210 LD Converters and the to-be-adjusted primary cooling system.The results show that,the primary soft cooling of Lianyuan 210 LD Converters has down-regulation space and the rate of corner cracks of casting slab is the least when the amount of mould cooling water is 4000/380 L/min.
出处 《武汉科技大学学报》 CAS 2013年第1期1-5,共5页 Journal of Wuhan University of Science and Technology
关键词 凝固模拟 结晶器冷却 冷却水量 角部裂纹 solidification simulation mould cooling amount of cooling water corner crack
  • 相关文献

参考文献7

二级参考文献29

共引文献23

同被引文献51

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部