摘要 低浓度瓦斯机组直接接入抽放站时会对瓦斯抽放站水环真空泵运行造成一定影响,基于瓦斯抽采站安全运行的重要性,文章对瓦斯电站建成后水环真空泵运行工况进行了针对性分析,并提出了改善系统压力的措施,结果表明,只要对水环真空泵采取合理的技术措施,低浓度瓦斯发电站的建设不会对瓦斯抽采站运行带来安全隐患。 When the resistance of the low concentration gas transportation system was high, the gas power generator set would cause certain influences to the operations of the water - ring vacuum pump in the gas drainage station. Base on the importance of the safety operation of the gas drainage station, the paper had an analysis on the operation performances of the water - ring vacuum pump since the establishment of the gas power generation plant completed and provided the measures to improve the pressure of the system. The results showed that once rational technology measures conducted to the water - ring vacuum pump, the construction of the low concentration gas power generation station would not cause any safety bidden trouble to the operation of the gas drainage station.
作者 杨俊辉
出处 《煤炭工程》 北大核心 2013年第1期60-62,共3页 Coal Engineering
关键词 瓦斯抽放站 低浓度瓦斯 瓦斯发电机组 瓦斯预处理 水环真空泵 gas drainage station low concentration gas gas power generator set gas pro - treatment water - ring vacuum pump
  • 相关文献

参考文献10

二级参考文献9

共引文献86

同被引文献43

引证文献5

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部