期刊文献+

侧吹熔炼铜渣的直流电贫化研究 被引量:7

Study on Dilution of Copper Side Blowing Smelting Slag with Direct Current
在线阅读 下载PDF
导出
摘要 使用小型交直流矿热电炉对富氧侧吹熔炼工艺产出的水淬铜渣进行贫化研究。结果表明,采用下负直流电贫化60min后渣含铜从0.73%降至0.28%,铜回收率约65%,比交流电提高约10个百分点。在1 160~1 350℃时熔渣温度对铜回收率影响不明显。黄铁矿精矿添加量为渣重10%时,渣含铜可降至0.24%,铜回收率约70%。渣含铜随冰铜品位的增高稍有增大的趋势。 The water quenching copper slag from oxygen enrichment side blowing smelting process was diluted in laboratory through alternating current (AC) and direct current (DC) ore-smelting electric furnace. The results show that copper content in slag is reduced from 0. 73% to 0. 28% after 60 minutes dilution with bottom-cathode DC. The copper recovery is about 65%, increasing 10 percentage compared with that with AC. A variety of slag temperature between 1 160-1 350 ℃ has no obvious effect on copper recovery. With the dosage of pyrite concen-trate of 10% of slag quantity, the copper content in slag will decrease to 0. 24%, and the copper recovery is about 70%. The copper content in slag increases slowly with the increase of matte grade.
出处 《有色金属(冶炼部分)》 CAS 北大核心 2012年第11期19-22,36,共5页 Nonferrous Metals(Extractive Metallurgy)
关键词 铜渣 贫化 直流电 矿热电炉 回收率 富氧侧吹熔炼 copper slag dilution direct current ore-smelting electric furnace recovery oxygen enrich-ment side blowing smelting
  • 相关文献

参考文献11

  • 1李秋菊,陈鹏,林姜多,毛佳君.铜滴在富FeO熔渣中的电迁移行为[J].材料与冶金学报,2010,9(1):28-30. 被引量:3
  • 2李长荣,江明丽.FeO-CaO-SiO_2熔渣中金属铜滴的电毛细迁移[J].中国有色冶金,2010,39(3):63-66. 被引量:4
  • 3李长荣,江明丽.铜渣中金属液滴电毛细迁移现象的显微观察[J].现代矿业,2011,27(2):44-46. 被引量:1
  • 4Warczok A, Utigard T A. Settling of Copper Drops in Molten Slags[J].Metallurgical and Materials Transac tions, 1995 (26B):1165-1173.
  • 5Degel R, Oterdoom H, Kunze J, et al. Latest results of the slag cleaning reactor for copper recovery and its po- tential for the PGM industry[C]//Third International Platinum Conference "Platinum in Transformation" ,The Southern African Institute of Mining and Metallurgy, Sun City,South Africa, 2008.
  • 6Warczok A, Riveros G. Slag cleaning in crossed electric and magnetic fields[J]. Minerals Engineering, 2007,20 (1) :34-43.
  • 7Degel R, Schreiter T, Schmieden H, et al. Rectangular furnace design and revolutionary DC slag cleaning tech- nology for the PGM industry [C]//International Plati num Conference " Platinum Surges Ahead", The South ern African Institute of Mining and Metallurgy, Sun Cit y, South Africa, 2006.
  • 8Warczok A, Riveros G, Montenegro V. Utilization of magnetohydrodynamie phenomena in slag cleaning,Cop per 2003: Volume 1V Pyrometallurgy oI Copper[C]// Proceedings of copper 2003-Cobre 2003 the 5th Interna- tional Conference, Santiago, Chile, 2003.
  • 9白厚善,金哲男,郎晓珍,等.炼铜炉渣的直流电贫化[C]//中国有色金属学会.2002年全国铜冶炼生产技术及产品应用学术交流会:2002年全国铜冶炼生产技术及产品应用学术交流会论文集.2002:40-45
  • 10魏国忠,W.吾特,叶国瑞.直流矿热电炉中铜转炉渣的贫化[J].东北工学院学报,1989,10(4):388-393. 被引量:6

二级参考文献28

共引文献14

同被引文献92

引证文献7

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部