摘要
计算机模拟技术愈来愈广泛地应用于水利工程施工各方面 (诸如地下洞室施工、土石坝施工、混凝土坝施工等方面 )的研究 ,并取得了许多成果 .其中对地下洞室施工过程的研究已有 2 0年左右的历史 ,研究愈来愈深入、完善 .为此 ,对国内外地下洞室群施工系统计算机仿真模拟研究进行了归纳性的阐述 ,将地下洞室施工系统研究的发展分为三个阶段 ,即传统研究阶段、计算机模拟研究早期发展阶段和计算机模拟研究最新发展阶段 .内容涉及最新的研究成果和研究动向 。
In recent years, computer simulation technology has been more and more comprehensively used in study of hydraulic engineering construction(such as underground tunnels & chambers, earth rock dams, concrete dams, etc.), and many compelling achievements have been acquired. It is 20 years or so since the construction process of underground tunnels & chambers has been studied, and the study tends to deepgoing and perfect. Having summarized the world′s computer simulation study in underground multi tunnels & multi chambers construction, this paper divides it into three stages ,viz., traditional research stage, early stage and latest stage using computer simulation, and also introduces the latest research achievements and develop tendency, moreover, points out the insufficiency of the study. It is of some significant reference for theory research and engineering practice.
出处
《水利水电技术》
CSCD
北大核心
2000年第4期34-36,共3页
Water Resources and Hydropower Engineering
关键词
地下洞室
施工系统
仿真模拟
水利水电工程
underground tunnel & chamber, construction system, simulation, latest development