超大跨度地下厂房施工期稳定性研究

Study on Stability of Extra Large Span Underground Powerhouse during Construction
在线阅读 下载PDF
导出
摘要 向家坝水电站超大跨度地下厂房处于相对较差的地质条件下,受多条断层和软弱夹层的影响且岩体节理裂隙发育,其施工期稳定性问题十分突出。对影响围岩稳定性的主要因素进行了分析,研究了其围岩稳定性特征,同时通过数值模拟研究了施工期围岩稳定性的相关规律和施工相关措施的影响,对同类超大跨度地下厂房的施工期稳定性研究具有重要的参考意义,对其设计和施工具有一定的指导作用。 At Xiangjiaba Hydropower Station,the extra large underground powerhouse is located in rock with relatively poor geological conditions and is affected by some faults and weak interlayers with developed rock joints.Therefore,rock stability during construction is prominent.In this paper,dominant factors influencing surrounding rock stability are analyzed and characteristics of surrounding rock stability are studied.In the same time,correlated rules of rock stability and influence of corresponding construction measures during construction are investigated by numerical simulation.The analysis results give references to other similar projects and provide guidance to project design and construction.
出处 《四川水力发电》 2009年第4期17-20,23,共5页 Sichuan Hydropower
关键词 岩石力学 地下厂房 工程地质 围岩稳定 软弱夹层 向家坝水电站 rock mechanics underground powerhouse engineering geology surrounding rock weak interlayers
  • 相关文献

参考文献3

二级参考文献32

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部