摘要
详细论述了超超临界机组全厂大集控的工程设计技术:水处理、除灰渣控制系统、上煤系统以及脱硫系统均取消就地控制室,实现在集控室对全厂所有系统的监视和控制。并结合国华台山发电厂二期2×1000MW超超临界机组扩建工程介绍超超临界机组全厂大集控的具体设计方案。
This paper detail introduce the conception of Entire Centralized Control for in Ultra Supercritical Unit: the separated control room can be canceled,which is used for the water treatment system,coal handling system,ash removing system,and flue-gas desulfurizing system;All systems of the unit can been monitored and controlled in center control room.And then introduce the detail scheme of the projection of taishan power plant 2×1000MW ultra supercritical expansion project.
出处
《自动化与仪器仪表》
2011年第6期25-26,29,共3页
Automation & Instrumentation
关键词
超超临界机组
全厂大集控
ultra supercritical unit
Entire Centralized Control