高速公路项目施工进度风险评价指标体系构建研究 被引量:8

Research on Establishment of Construction Schedule Risk Assessment Index System of Expressway Project
在线阅读 下载PDF
导出
摘要 提出了高速公路项目施工进度风险评价指标体系的构建思路,即采用频度统计法、调查问卷法及专家函询法对风险因素识别和筛选,且从规划的数学角度将其划分为硬、软约束条件,从而构建了风险评价的指标体系,并进一步对该指标体系适用性进行分析。 Combining the characteristics of schedule risk of expressway project construction,this article expounds contents and procedure of expressway project construction schedule risk assessment and puts forward how to construct the index system,by using frequency statistics literature screening method,expert questionnaire survey method and the Delphi method to identify the expressway project construction schedule risk indexes.Then the article divides them into hard and soft constraint conditions from the planning point of view.Lastly,the article builds an expressway project construction schedule risk assessment index system,and then makes an analysis of applicability of the system.
出处 《沈阳建筑大学学报(社会科学版)》 2011年第2期185-189,共5页 Journal of Shenyang Jianzhu University:Social Science
关键词 风险评价 指标体系 施工进度 高速公路项目 risk assessment index system construction schedule expressway project
  • 相关文献

参考文献8

二级参考文献26

  • 1赵朋,刘应宗.模糊综合评价法在建设工程承包风险评估中的应用[J].施工技术,2004,33(12):54-56. 被引量:4
  • 2温胜强.高速公路项目融资风险层次分析模型研究[J].中外公路,2005,25(3):117-120. 被引量:7
  • 3DIKMEN I, BIRGONUL M T, HANS. Using fuzzy risk assessment to rate cost overrun risk in international construction projects [ J]. International Journal of Project Management, 2007, 25 (5) : 494 -505.
  • 4MOTAWA I A, ANUMBA C J, EL - HAMALAWI A. A fuzzy system for evaluating the risk of change in construction projects [ J ]. Advances in Engineering Software, 2006, 37 (9) : 583 -591.
  • 5LU ZHAO - MING, HU BAO - QING, LU JUN - AN, et al. Fire safety gray relational evaluation for existing buildings. Engineering Journal of Wuhan University [J]. 2004, 37 (5): 62-66.
  • 6MARIA - SANCHE Z P. Estimation of environmental risks in construetion projects in Puebla (Mexico): a neural network approach [J]. Management Information Systems, 2004 (9) : 603 -612.
  • 7GUNAYDIN H M, DOGAN S Z. A neural network approach for early cost estimation of structural systems of buildings [ J ]. International Journal of Project Management, 2004, 22 (7) : 595 -602.
  • 8ZHENG D X M, NG S T, KUMARASWARNY M M. Applying a genetic algorithm - based muhiobjective approach for time - cost optimization [ J]. Journal of Construction Engineering and Management, 2004, 130 (2) : 168 -176.
  • 9FLORENCE YEAN YNG LING, HOI L. Risks faced by Singapore firms when undertaking construction projects in India [ J ]. International Journal of Project Management, 2006, 24 (3) : 261 -270.
  • 10JOHNSON R A,WICHERN D W.实用多元统计分析[M].4版.陆璇,等,译,北京:清华大学出版社.2001.

共引文献22

同被引文献23

引证文献8

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部