摘要建筑信息模型(Building Information Modeling,BIM)技术,正引领建筑业信息技术走向更高层次。本文分析了BIM技术应用于工程项目进度计划与控制的现状,并基于集成管理的思想,探讨了应用BIM技术编制进度计划和实施进度控制的可行性。最后以某大型机场项目为例,提出基于BIM的进度计划编制构想。
6Rob Howard,Bo-Christer Bjork.Building information modeling-Experts' views on standardisation and industry deployment[J].Advanced Engineering Informatics 22 (2008) 271-280.
7Bilal Succar.Building information modeling framework.A research and delivery foundation for industry stakeholders[J].Automation in Construction 18 (2009) 357-375.
8C.Eastman,P.Teicholz,R.Sacks,and K.Liston.BIM Handbook.A Guide to Building Information Modeling for Owners,Managers,Designers,Engineers and Contractors[M],NY.John Wiley and Sons,2008.
4Chuck Eastman, Paul Teicholz, Rafael Sacks (Eds.).BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors [M], NewYork:John Wiley and Sons, 2008:233-244.
7Chuck Eastman,Paul Teicholz,Rafael Sacks(Eds).BIM Handbook:A Guide to Building Information Modeling for Owners,Mamagers,Designers,Engineers and Contractors[M],New York:John Wiley and Sons,2008:233-244.