丰满大坝全面治理方案选择研究 被引量:18

Selection on Fengman Dam Comprehensive Reinforcement Program
在线阅读 下载PDF
导出
摘要 丰满水电站始建于1937年,历史原因,使大坝建成后存在诸多缺陷。新中国成立后,曾进行过三次大规模的系统补强加固和持续不断的日常维护,但仍存在影响大坝安全运行的重大隐患。通过分析丰满大坝存在的问题及多个治理方案,并对其中3个重点方案进行对比论证,建议选择重建方案作为丰满大坝的全面治理方案。 Fengman Hydropower Station was built in 1937 and has many defects in the dam due to historical reasons.In order to improve dam safety,three large-scale reinforcements and routine maintenance have been conducted since 1949,but major risks still exist which will affect the safe operation of the dam.After problems analysis and comprehensive comparison of different reinforcement programs,dam rebuilding is recommended as the best selection for Fengman Dam reinforcement.
出处 《水力发电》 北大核心 2010年第1期60-62,共3页 Water Power
关键词 混凝土重力坝 治理方案 筛选 丰满大坝 concrete gravity dam comprehensive reinforcement program selection Fengman Dam
  • 相关文献

参考文献4

  • 1中国水电顾问集团华东勘测设计研究院.苦林省丰满水电站大坝全面治理工程预可行性研究报告[R].沈阳:东北电网有限公司.2009.
  • 2中水东北勘测设计研究院有限责任公司.丰满水电站全面治理工程(重建方案)预可行性研究报告[R].沈阳:东北电网有限公司.2009.
  • 3中国水利水电科学研究院.丰满大坝全面治理方案可行性研究[R].沈阳:东北电网有限公司,2007.
  • 4东北电网有限公司.丰满水电站全面治理工程(建设期)对上下游影响分析报告[R].沈阳:东北电网有限公司,2009.

同被引文献51

引证文献18

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部