施工导流工程是一项风险工程,在进行施工导流工程的风险计算时,应综合考虑水文和水力两方面的不确定性,利用JC法计算了施工导流风险,分析了各不确定性因素对施工导流综合风险的影响。
The diversion project is a risky work. Therefore, quantifying uncertainties involved in diversion project is helpful to the choice of design flood and diversion alternative. In this paper, the JC method is used to perform the diversion risk analysis. The effect and importance of the uncertainties on total risk of diversion project for hydraulic parameters are analysed.
出处
《水科学进展》
EI
CAS
CSCD
1996年第4期361-366,共6页
Advances in Water Science
基金
国家"八五"重点科技攻关资助