基于层次分析法和多级模糊综合评价的火电厂项目影响后评价研究 被引量:17

Study on Thermal Power Plant Impact Post-Evaluation Based on AHP and Multi-Level Fuzzy Comprehensive Evaluation
原文传递
导出
摘要 介绍了火电厂项目影响后评价的概念,建立了一个相对完整的项目影响后评价指标体系,并以某火电厂扩建项目为例,使用层次分析法和多级模糊综合评价方法对该火电厂项目影响进行评价,提出了目前项目影响后评价中存在的问题,对火电厂项目影响进行了定性和定量的评价。 In this paper,the concept of the thermal power plant impact post-evaluation was presented and a relatively complete indicator system for project impact post-evaluation was established.Taking a thermal power plant expansion project as an example;the project impact was assessed by analytic hierarchy process and multi-level fuzzy comprehensive evaluation.The problems in the current project impact post-evaluation were proposed,and the qualitative and quantitative assessment of the impact of the thermal power plant project was conducted.
作者 牛东晓 许聪
出处 《华东电力》 北大核心 2010年第9期1413-1416,共4页 East China Electric Power
基金 国家自然科学基金对外交流与合作项目(70810024)~~
关键词 项目影响后评价 AHP 多级模糊综合评价 project post-evaluation AHP multi-level fuzzy comprehensive evaluation
  • 相关文献

参考文献5

二级参考文献24

共引文献34

同被引文献101

引证文献17

二级引证文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部