多对多板坯倒垛问题的一种邻域搜索算法 被引量:7

Local search algorithm for the overlapped turned-out slab pile problem
在线阅读 下载PDF
导出
摘要 为解决热轧生产计划中出现的板坯倒垛问题,建立了基于轧制位置与库内板坯多对多对应关系的问题模型,提出了一种新的邻域搜索算法。该算法考虑到轧制计划中的板坯规格组在库内垛位中连续堆放的特点,引入了Sequence邻域概念,使算法能够更好地利用问题的特征,并通过两阶段的寻优替换对问题进行求解。实验结果表明了所提模型和算法的可行性和有效性。 To deal with the slab stack shuffling problem in the hot rolling schedule,a programming model based on many-to-many match-up relationship between the rolling position and the slabs in the slab yard was constructed.And a new neighborhood search algorithm was designed to solve the proposed model.Considering the specification slabs in the rolling planning may stack in the piles continuously,a concept of Sequence Neighborhood with the feature of non-static and serial was introduced Being different from existing static and independent neighborhood structures,the algorithm could make better use of the problem characteristics,and the two-stage optimization replacement procedure was adopted to solve the problem.The experimental results revealed the feasibility and effectiveness of the proposed models and algorithm.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2010年第3期658-662,671,共6页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(70771008 70371057)~~
关键词 板坯倒垛问题 邻域搜索算法 启发式算法 板坯库 钢铁企业 slab stack problem local search algorithm heuristic algorithm slab yard iron&steel
  • 相关文献

参考文献11

二级参考文献68

  • 1李建祥,唐立新,吴会江,庞哈利.基于规则的热轧钢管调度[J].钢铁,2004,39(9):39-42. 被引量:7
  • 2李耀华,王伟,徐乐江,宁树实,张大波.热轧生产轧制计划模型与算法研究[J].控制与决策,2005,20(3):275-279. 被引量:21
  • 3李苏剑,陈宗海.宝钢板坯库出库计划优化模型[J].物流技术,1996,15(1):18-21. 被引量:3
  • 4[1]Tang Lixin,Liu Jiyin, Aiying Rong,et al. Modeling and a Genetic Algorithm Solution for the Slab Stack Shuffling Problem When Implementing Steel Rolling Schedules[J]. International Journal of Production Research, 2002, 40(5): 1583~1595
  • 5[2]Feng Xin, Tang Lixin,Leung Hofung. Applying GENET to the JSSCSOP[R]. Lecture Notes in Computer Science 3173, 2004:454~461
  • 6[3]Tang Lixin, Xuan Hua,Liu Jiyin. A New Lagrangian Relaxation Algorithm for Hybrid Flowshop Scheduling With Total Weighted Completion Time[J]. Computer & Operations Research,(Accepted),2005.
  • 7[4]Tang Lixin,Huang Lin.An Exact Algorithm & Near-optimal Algorithms to Rolling Batch Scheduling for Seamless Steel Tube Production[J]. International Journal of Production Economic(Accepted), 2004.
  • 8[5]Tang Lixin,Zhang Yanyan. A Neural Network Model and Algorithm for the Hybrid Flow Shop Scheduling Problem[J]. Lecture Notes in Computer Science (Accepted), 2005.
  • 9[6]Feng Xin, Leung Hofung,Tang Lixin. A Genet Neural Network Model and Algorithm for the Job Shop Scheduling Problem[J]. Lecture Notes in Computer Science (Accepted), 2005.
  • 10[7]Tang Lixin,Liu Jiyin. A Comparison of Tabu Search and Local Search Methods for Single Machine Scheduling With Ready Time[C]. 14th IFAC World Congress, Beijing, China, July, 6-8, 1999.

共引文献61

同被引文献44

引证文献7

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部