象山隧道帷幕注浆快速施工技术探讨 被引量:9

Discussion on Rapid Curtain Grouting Technology in Xiangshan Tunnel
在线阅读 下载PDF
导出
摘要 以象山隧道3#斜井工区正洞帷幕注浆施工为例,对比3个不同地质段的帷幕注浆施工情况,对全断面帷幕注浆、周边帷幕注浆、局部帷幕注浆3种不同的注浆方案进行探讨,分析不同水文地质条件下注浆方式的选择对施工进度的影响,寻找最优的注浆方案,优化注浆施工和施工组织技术,达到控制成本,缩短工期的目的。 The curtain grouting constructions in 3 different hydro-geological sections of the main tunnel in No. 3 inclined shaft work lot of Xiangshan tunnel are compared. Three different grouting schemes, i. e. , full-face curtain grouting, surrounding curtain grouting and local curtain grouting, are discussed. The influence of different grouting schemes on the construction efficiency under different hydro-geological conditions is analyzed. Optimal grouting schemes are determined, the grouting technology and the construction organization technology are optimized, which achieves better controlled construction cost and reduced construction period.
作者 易凯 张迎华
出处 《隧道建设》 2010年第1期78-83,共6页 Tunnel Construction
关键词 帷幕注浆 方案优化 快速施工 止浆墙 施工组织 curtain grouting scheme optimization rapid construction wall for grouting construction organization
  • 相关文献

参考文献5

二级参考文献6

共引文献98

同被引文献63

引证文献9

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部