龙厦铁路象山隧道岩溶段施工关键技术 被引量:2

Critical construction technology at karst section of Xiangshan tunnel of Long-Xia railway
在线阅读 下载PDF
导出
摘要 结合象山隧道地质特征,通过对全断面、半断面帷幕注浆的工艺流程、注浆参数选择、注浆材料、注浆效果的分析,提出软弱围岩处理过程中要确保施工安全、降低水害风险、采用动态设计;全断面、半断面帷幕注浆封堵采用信息化跟踪注浆工法和快挖快封技术,对软弱围岩处理具有实践性指导意义。 Combining with Xiangshan tunnel geology features, the paper analyzes the full section and half section curtain grouting procedures, grouting parameter selection, grouting materials and grouting effect, puts forward some advices, such as ensuring construction security, reducing water damage risk and applying dynamic design in soft surrounding rock treatment, applying informational following grouting technology and fast excavation and fast sealing technology in full section and half section curtain grouting, which has practical meaning for guiding soft surrounding rock treatment.
作者 徐少争
出处 《山西建筑》 2012年第34期215-217,共3页 Shanxi Architecture
关键词 帷幕注浆 全断面 半断面 软弱围岩 岩溶 curtain grouting, full section, half section, soft surrounding rock, karst
  • 相关文献

参考文献3

二级参考文献18

共引文献14

同被引文献29

引证文献2

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部