期刊文献+

三峡电站电气主接线可靠性分析 被引量:5

Reliability evaluation of the Three Gorges power station configuration
在线阅读 下载PDF
导出
摘要 运用统一n+2状态马尔可夫模型,选择三峡机组投产至2006年(三峡工程二期结束及三期初期)这一典型阶段为主要研究内容,对三峡左岸电站在不同运行方式和负荷水平下进行供电连续性、充裕性的计算分析,并对各个元件可靠性参数进行敏感度分析,分析发现:改变发电机和断路器的故障率对整个电站的可靠性有显著影响,由此提出改善当前电站机组及系统可靠性的指导性建议。 Based on the generalized n+2 state Markov model, this paper chooses the period between the beginning that the generators are brought into service and 2006 (the end of the second-phase of the Three Gorges Project) as the research content, and presents the continuity, adequacy and security calculation of the Three Gorges left bank power station. Also the reliability indices of different operating philosophies and load standards are compared and analyzed. The sensitivity indices of reliability of the Three Gorges power station with respect to equipment parameters and the reason why the reliability indices is low are analyzed, the results show that the influence on changing the failure rate of generators and breakers is obvious, and suggestions to improve the reliability are finally proposed.
出处 《电力系统保护与控制》 EI CSCD 北大核心 2009年第3期21-26,共6页 Power System Protection and Control
关键词 三峡电站 电站主接线 统一n+2状态马尔可夫模型 可靠性综合分析 敏感度分析 the three gorges power station power station configuration generalized n+2 state Markov model reliabilityanalysis sensitivity analysis
  • 相关文献

参考文献8

二级参考文献22

  • 1张鹏,郭永基.电气主接线可靠性评估的区间方法[J].电力系统自动化,2004,28(19):48-52. 被引量:30
  • 2陈华,周家启,王耀辉,吴建生,李定中.瀑布沟水电站电气主接线方案可靠性计算[J].水电站设计,1994,10(3):67-73. 被引量:11
  • 3沈根才 陈汉章.三峡工程的电力系统问题.中国三峡工程论文集[M].北京:水利电力出版社,1990..
  • 4王锡凡.包含多个水电机组的随机生产模拟[J].西安交通大学学报,1985,(4).
  • 5别朝红,王锡凡.配电系统的可靠性分析[J].中国电力,1997,30(5):10-13. 被引量:100
  • 6ENDRENYI J. Three state models in power system reliability evaluation. IEEE Trans on Power Apparatus and Systems,1971, 90(4): 1909-1916.
  • 7BILLINTON R, MEDICHERLA T K P. Station originated multiple outage in the reliability analysis of a composite generation and transmission system. IEEE Trans on Power Apparatus and Systems, 1981, 100(8):3870-3878.
  • 8BILLINTON R, LIAN G. Station reliability evaluation using a Monte Carlo approach, IEEE Trans on Power Delivery, 1993,8(3): 1239-1245.
  • 9BILLINTON R, LI W Y. Reliability assessment of electrical power systems using Monte Carlo methods. New York, NY,USA: Plenum Publishing, 1994.
  • 10BILLINTON R, CHEN Hua, ZHOU Jiaqi. Generalized n+2 state system Markov model for station-oriented reliability evaluation. IEEE Trans on Power Systems, 1997, 12(4):1511-1517.

共引文献56

同被引文献31

  • 1赵渊,周念成,谢开贵,况军.大电力系统可靠性评估的灵敏度分析[J].电网技术,2005,29(24):25-30. 被引量:51
  • 2张鹏,郭永基.电气主接线可靠性评估的区间方法[J].电力系统自动化,2004,28(19):48-52. 被引量:30
  • 3董百强,谢开贵,周家启.电站3/2接线和4/3接线的可靠性比较分析[J].重庆大学学报(自然科学版),2006,29(10):10-15. 被引量:5
  • 4BILLINTON R, CHEN H, ZHOU Jia-qi. Generalized n+2 State System Markov Modle for Station-oriented Reliability Evaluation [J]. IEEE Trans on Power Systems, 1997, 12 (4): 1511-1517.
  • 5WANG Xi-fan,WANG Xiu-li. Generalized Outage Table Approach to Reliability Study of Power Station's Bus Schenes [J]. IEEE Trans on Power Delivery. 1997,12(4): 1480-1485.
  • 6国家电网公司.Q/GDW294—20091000kV变电站设计技术规定(电气部分)[s].北京:国家电网公司,2009.
  • 7Abate N, Garg A, Peshock RM, et al. Relationship of generalized and regional adiposity to insulin sensitivity in men with NIDDM. Diabetes, 1996,45:1684-1693.
  • 8Report of a WHO Consultation. Definition, diagnosis and classification of diabetes and its complications. Geneva: Word Health Organization. 1999.4-7.
  • 9Guideline Subcommittee. 1999 WHO-International Society Hypertension. Guideline for the management of hypertension. J Hypertension, 1999,17:151-183.
  • 10Bonara E, Sagiani F, Targher G, et al. Homeostasis model assessment closely mirrors the glucose clamp technique in the asessment of insulin sensitivity. Diabetes Care, 1999,22:1462-1479.

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部