期刊文献+

发电厂可靠性评估的解析方法

在线阅读 下载PDF
导出
摘要 本文以沙角B厂为例说明了发电厂可靠性评估的解析方法,得出了沙角B厂的一系列可靠性指标。敏感度分析表明发电机和变压器是系统的薄弱环节,针对该薄弱环节,本文提出了改善系统可靠性的措施,并分析了相应的投资成本。本文介绍的方法广泛适用于电力系统中发电厂可靠性评估。
出处 《贵州电力技术》 2005年第9期1-6,共6页 Guizhou Electric Power Technology
  • 相关文献

参考文献7

  • 1R. Billinton, R.N. Allan, "Reliability evaluation of engineering systems: concepts and techniques", Second edition, New York,Plenum Press, 1992.
  • 2R. Billinton, R.N. Allan,"Reliability evaluation of power systems",Second edition, New York, Plenum Press, 1996.
  • 3R. Billinton, S. Kumar, N. Chowdhmy, K. Chu, K. Debnath, L. Goel, E. Khan,; P. Kos, G. Nourbakhsh, J.Oteng- Adjei, "A reliability test system for educational purpooes- basic data", 1EEE Tramaefiom, Power Systems, vol.4, pp. 1238 -1244,Aug. 1989.
  • 4R. Billinton, H. Chen, Jiaqi Zhou, "Individual generating station reliability assessment", IEEE Transactions, Power Systems,vol. 14, pp. 1238 -1244, Nov. 1999.
  • 5J.W. Lamont, J. Fu, "Cost analysis of reactive power support", IEEE Transactions, Power Systems, vol. 14, pp. 890- 898, Aug. 1999.
  • 6D.O. Koval, Xinlie Zhang, J. Propst, T. Coyle, R. Amo,R.S. Hale, "Reliability methods applied to The IEEE Gold Book Standard Network", IEEE Industry Applications Magazine, vol. 9, pp. 32 -41, Jan.-Feb. 2003.
  • 7Wenyuan Li, R. Billinton, "Common cause outage models in power system reliability evaluation", IEEE Transactions, Power Systems, vol. 18, pp. 966 -968, May 2003.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部