期刊文献+

异地协同制造资源优化配置过程模型及实现 被引量:21

Collaborative manufacturing resources optimization deployment process model and its realization
在线阅读 下载PDF
导出
摘要 针对复杂零件异地协同制造的资源优化配置问题,提出敏捷加工路线的概念,建立以工艺流程为核心的制造资源优化配置概念模型和过程模型。将制造资源优化配置问题归结为逻辑制造单元—物理制造单元映射、物理制造单元排序筛选和敏捷加工路线的优化生成三过程,并分别给出了其实现方法。最后,论述了网络化制造资源优化配置平台的构建,并应用于某型号发动机叶片协同制造,验证了优化配置过程模型的可行性和实用性。 To deal with networked collaborative manufacturing resources optimization deployment problem, a new conception, Agile Manufacturing Process (AMP) was defined. For the purpose of AMP's creation, the basic conception model and process model of manufacturing resources optimization deployment were constructed by taking processing flow as core. And the networked manufacturing resources optimization deployment process model was summarized as three basic sub-processes: Logical Manufacturing Unit (LMU)-Physical Manufacturing Unit (PMU) mapping, filtering PMU and AMP optimization and creation. Realization methods for these sub-processes were also provided. Finally, the establishments of networked manufacturing resources optimization deployment platforms were discussed, and the application process as well as operation result were analyzed by taking the turbine blade of an aero engine as a typical case. Feasibility and applicability of the process model were verified.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2008年第3期455-461,共7页 Computer Integrated Manufacturing Systems
基金 国家863/CIMS主题资助项目(2006AA04Z144) 国家科技支撑计划资助项目(2006BAF04B02)~~
关键词 敏捷加工路线 资源优化配置 物理制造单元 逻辑制造单元 逻辑加工路线 可执行加工路线 agility manufacturing process resources optimization deployment physical manufacturing unit logical manufacturing unit logical manufacturing process executive manufacturing process
  • 相关文献

参考文献20

  • 1TALLURI S, BAKER R, SARKIS J. A framework for designing efficient value chain networks[J]. International Journal of Production Economics,1999, 62(1/2) : 133-144.
  • 2IP W H, HUANG M, YUNG K L, et al. Genetic algorithm solution for a risk-based partner selection problem in a virtual enterprise[J]. Computers and Operations Research, 2003,30 (2) : 213-231.
  • 3IP W H, YUNG K L, WANG Dingwei. A branch and bound algorithm for sub-contractor selection in agile manufacturing environment[J]. International Journal of Production Economics, 2004,87(2) :195-205.
  • 4KASLINGAM R, LEE C. Selection of vendors-a mixed integer programming approach[J]. Computers and Industrial Engineering, 1996, 31 (1/2) : 347-50.
  • 5MIKHAILOV L. Fuzzy analytical approach to partnership selection in formation of virtual enterprises[J]. Omega, 2002,30 (5) :393-401.
  • 6OSSADNIK W. AHP-based synergy allocation to partners in a merger[J]. European Journal of Operational Research, 1996, 88(1):42-49.
  • 7赵乃岩,范玉顺.基于产品结构的动态联盟盟员选择算法[J].计算机集成制造系统-CIMS,2002,8(2):99-104. 被引量:24
  • 8冯蔚东,陈剑,赵纯均.基于遗传算法的动态联盟伙伴选择过程及优化模型[J].清华大学学报(自然科学版),2000,40(10):120-124. 被引量:140
  • 9戴毅茹,严隽薇.基于市场驱动的虚拟企业伙伴选择方法[J].计算机集成制造系统-CIMS,2002,8(9):710-714. 被引量:18
  • 10WU N Q, MAO N, QIAN Y M. An approach to partner selection in agile manufacturing[J]. Journal of Intelligent Manufacturing, 1999, 10(6): 519-529.

二级参考文献59

共引文献262

同被引文献207

引证文献21

二级引证文献116

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部