多年冻土区昆仑山隧道浅埋段出现渗漏水后,浅埋段的地温特征成为治理病害的重要依据之一。根据2004年3~5月份的地质观测资料,分析浅埋段的地温特征,并采用数值模拟技术,追溯隧道工程施工前的地温状态,从而得出该隧道浅埋段2#冲沟存在一个未被冻结的通道;隧道工程对周边地温产生较大影响;最大冻结深度约10 m,最大融化深度不超过4 m。
Since water seepage comes out of Kunlun Mountain tunnel at a valley, understanding the ground temperature at the valley is one of the most important things to treat the disease. The ground temperature is studied; it is traced back before tunneling by numerical simulation on the basis of geological observation information from March to May, 2004. So it is educed as follows: (1) there is an unfrozen channel underground the valley; (2) the ground temperature around the tunnel is affected by tunneling; (3) the maximum frozen depth is about 10 m; and the maximum thawing depth is not over 4 m.
出处
《岩土力学》
EI
CAS
CSCD
北大核心
2007年第11期2396-2400,共5页
Rock and Soil Mechanics
基金
铁道部重点项目(No.2001G001-E-03)
关键词
多年冻土
地温
数值模拟
permafrost
ground temperature