摘要
以提高芯片生产厂家的市场竞争力、芯片合格率和按期交货率为主要调度目标,该文提出了基于多agent技术的半导体生产线动态调度算法,各加工中心agent相互合作,调度时协同考虑上下游加工中心的信息,共同满足优化调度的目的,仿真实验证明了算法的有效性。
To raise the chip yield and on-time-delivery rate so as to promote the competitive ability of the chip producers, a multi-agent technology based dynamic schedule algorithm of semiconductor fabrication line is proposed. To optimize the schedule system, the machining center agents cooperate with each other, both up and down stream information is taken into consideration when scheduling. The validity of this algorithm is demonstrated by simulation.