摘要
介绍了300 MW无旁路机组甩负荷的试验过程,详述了在DEH组态中关于甩负荷所涉及的逻辑,并对甩负荷后中调门的控制方法和实际效果进行了对比分析及建议。
Load shedding test of 300 MW unit without bypass system is introduced. Load shedding-related logics in DEH configuration is explained in detail. A comparison was made between the control of regulating valve and its actual result after load shedding ,and suggestions are put forward.
出处
《华北电力技术》
CAS
2007年第4期20-22,32,共4页
North China Electric Power