摘要
总结我国部分大型机组进行甩负荷试验的经验和结果,指出甩负荷试验牵涉各专业,作为调试期间的一项重大试验,必须参照原部颁导则,结合机组的实际情况进行。对甩负荷试验的目的、时间安排、调节系统与OPC转速控制系统之间的协调关系等作了探讨。
In this paper, the load-rejection test experiences and results of part domestic large size generaing units are summarized. The authors point out that as a very important test during commissioning stage of a large size generating unit, the load-rejection test, which involves various professionals, must be catried out by reference to the relevant guides issued by the Ministry and combining with the actual conditions of the unit. Also the purpose, the arrangement schedule of load-rejection test as well as the coordinate relation ship between governing system and speed control system OPC are discussed.
出处
《中国电力》
CSCD
北大核心
2000年第7期84-88,共5页
Electric Power
关键词
大型机组
甩负荷试验
调节系统
汽轮机
large size generating unit
load rejection test
governing system
dynamic characteristics