期刊文献+

锌对昆钢2000 m^3高炉的危害 被引量:26

Harmful Effect of Zinc to KISCO 2000 m^3 Blast Furnace
在线阅读 下载PDF
导出
摘要 昆钢6号高炉(2 000 m3)开炉3年以后发生了严重的风口上翘现象,给高炉生产造成较大影响。通过研究分析,确认Zn在风口组合砖内的富集、膨胀是造成风口上翘的主要原因。Zn对风口砖衬的破坏行为是随着Zn的侵入、富集和膨胀,使砖体组织结构由致密转变为疏松,然后逐步形成斑状→条纹状→沟槽状→矿脉状→肿瘤状的侵蚀通道,直至砖体破裂。研究发现了K、Na、Zn、Pb等有害元素进入风口砖衬顺序为K、Na、Zn、最后是Pb,并观察到Zn在砖衬内部的结晶发育过程。 Tuyeres of No. 6 blast furnace(2000 m^3) at Kunming iron and steel company tilted upwards after three years of operation, which impacted on the production of blast furnace. It was clarified that the main factor enrichment and expansion of zinc in tuyere bricks. The structure of tuyere bricks turn from dense to loosen with zinc penetration and expansion making an erosion passage from spot-like to stripe-like, to ditch-like to vein-like and finally to tumor-like. The research found that the sequence of penetration of elements, such as K, Na, Zn and Pb into refractories is K, Na, Zn and Pb. The crystallization and growth of Zn deposit in refractories was recorded too.
出处 《钢铁》 CAS CSCD 北大核心 2006年第9期9-12,共4页 Iron and Steel
关键词 高炉 风口 侵蚀 有害元素 blast furnace tuyerel zinc erosionl harmful element
  • 相关文献

参考文献5

  • 1Gladyshev V I,Filippov V V,Rudin V S.Influence of Zinc on the Life of the Hearth Lining and Blast Furnace Operation[J].Steel in Translation,2001,(31) 1:11-14.
  • 2Hafez A I,Elmanharawy M S,Abdel Fattah M A.Chemical Treatment of the Water Used in the Blast Furnace Gas Cleaning Cycle in the Egyptian Iron and Steel Company[J].International Journal of Environment and Pollution,2002,(12) 4:359-371.
  • 3李肇毅.宝钢高炉的锌危害及其抑制[J].宝钢技术,2002(6):18-20. 被引量:78
  • 4Shchukin Yu P,Sedinkin V I,Polushkin M E.Removal of Blast Furnace Sludge with High Zinc Content from Recycling[J].Steel in Translation,1999,29 (11):6-8.
  • 5杨雪峰,储满生,王涛.昆钢2000m^3高炉风口上翘原因分析及治理[J].炼铁,2005,24(4):1-4. 被引量:19

共引文献87

同被引文献345

引证文献26

二级引证文献109

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部