崇文门地铁车站管幕预支护施工效应模拟分析 被引量:12

Simulation analysis of the construction effect of pipe curtain forepoling in Chongwenmen subway station
在线阅读 下载PDF
导出
摘要 北京地铁五号线崇文门站下穿既有地铁一号线区间隧道,车站顶板与区间隧道底板间距2.858 m,施工中为了严格控制既有环线区间隧道的沉降,确保环线地铁运营安全,首次采用了管幕预支护技术。文章采用3D-S igm a三维有限元软件对施工效应进行模拟分析,预测车站施工引起的既有隧道的沉降量,以确定合理的管幕预支护参数及其作用效果。 Chongwenmen Station on line No. 5 of Beijing subway traverses beneath the existing transit tunnel of line No. 1 of Beijing subway. The distance between the roof of the station and the bottom plate of the transit tunnel is 2. 858 m. In order to control the subsidence of the transit tunnel and guarantee the safety of operation strictly, pipe curtain is used as fore - poling for the first time. In order to confirm the rational parameters and the effect of pipe curtain fore -poling, three -dimensional finite element software, 3D -Sigma, is used to simulate and analyze the construction effect. In addition, the subsidence of the transit tunnel due to the construction of the station is predicted.
出处 《现代隧道技术》 EI 北大核心 2006年第4期12-15,共4页 Modern Tunnelling Technology
关键词 地铁车站 立体交叉 管幕预支护 施工效应 三维有限元 Subway station Cross -over Pipe curtain fore -poling Construction effect Three -dimensional finite element
  • 相关文献

参考文献8

二级参考文献19

  • 1王明年,翁汉民,李志业.隧道仰拱的力学行为研究[J].岩土工程学报,1996,18(1):46-53. 被引量:96
  • 2铁道部.铁路桥涵技术规范[M].北京:中国铁道出版社,1995..
  • 3方从启.基于半解析元法研究顶管施工引起的地层运动[M].上海:同济大学,1998..
  • 4铁道部科学研究院铁道建筑研究所.既有线路基土的性质[M].北京:铁道部科学研究院,1995..
  • 5铁道部第一勘测设计院.铁路工程设计技术手册-路基[M].北京:中国铁道出版社,1995..
  • 6ANSYS公司.ANSYS非线性分析指南[M].北京:美国ANSYS公司北京办事处,1998..
  • 7.处理手册(第二版)[S].北京:中国建筑工业出版社,2000..
  • 8方从启,学位论文,1998年
  • 9ANSYS 公司,ANSYS非线性分析指南,1998年
  • 10铁道部科学研究院铁道建筑所,既有线路基土的性质,1995年

共引文献58

同被引文献72

引证文献12

二级引证文献77

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部