摘要 北京地铁五号线崇文门站下穿既有地铁一号线区间隧道,车站顶板与区间隧道底板间距2.858m。为了严格控制既有环线区间隧道的沉降,确保环线地铁运营安全,准备首次采用顶管作超前预支护,用3D-Sigma三维有限元软件进行施工效应的计算模拟,掌握顶管预支护洞室的力学效应。预测车站施工引起既有隧道的沉降量。 The Chongwenmen Station of No. 5 Line of Beijing Subway goes beneath the existing No. 1 Line of the interval tunnel of Beijing Subway. The distance between the roof of the station and the bottom board of the interval tunnel is 2. 858m. Strictly to control the subsidence of the interval tunnel and ensure the safety of the operation, pipejacking is to be used as pre-support for the first time. Three-dimensional finite element software,3D-Sigma , is used to calculate and simulate the construction effects. The mechanic effect of the hole room with pipejacking pre-support is well mastered. In addition,the paper also forecasts the possible subsidence of the interval tunnel because of the construction of the station.
出处 《国防交通工程与技术》 2003年第3期43-45,共3页 Traffic Engineering and Technology for National Defence
关键词 顶管 预支护 三维有限元分析 施工效应 北京 地铁五号线 隧道沉降 拱顶沉降 pipejacking pre-support three-dimensional finite element construction effect
  • 相关文献

参考文献5

二级参考文献19

  • 1冯卫星,侯学渊,夏明耀.隧道施工引起地面沉陷的几何非线性分析[J].岩石力学与工程学报,1995,14(1):1-10. 被引量:15
  • 2张民庆.小导管超前预注浆中注浆管管长和偏角的确定[J].西部探矿工程,1997,9(4):28-30. 被引量:6
  • 3铁道部.铁路桥涵技术规范[M].北京:中国铁道出版社,1995..
  • 4方从启.基于半解析元法研究顶管施工引起的地层运动[M].上海:同济大学,1998..
  • 5铁道部科学研究院铁道建筑研究所.既有线路基土的性质[M].北京:铁道部科学研究院,1995..
  • 6铁道部第一勘测设计院.铁路工程设计技术手册-路基[M].北京:中国铁道出版社,1995..
  • 7ANSYS公司.ANSYS非线性分析指南[M].北京:美国ANSYS公司北京办事处,1998..
  • 8冯卫星,中国科协首届青年学术年会河北卫星会议论文集,1992年
  • 9张汝清,非线性有限元分析,1990年
  • 10龚尧南,结构分析中的非线性有限元素法,1986年