期刊文献+

浅埋大跨超近距多洞室暗挖施工监测分析 被引量:7

Analysis and Monitoring of the Deformation While Excavating Shallow Buried Multi-caves with Large Span and Ultra-short Distance Between Each Other
在线阅读 下载PDF
导出
摘要 大跨车站开挖过程中,受浅埋近距离多洞室等复杂情况的影响,隧道围岩呈现出非线性沉降,因此这种地铁车站开挖必须实施信息化施工。通过地表监测及时掌握围岩力学状态,及时采取对策,实施动态施工,以确保隧道暗挖施工安全。 Being influenced hy the complicated conditions from the excavating of shallow buried multi-eaves with ultra-short distance between each other, the non-linear settlement of surrounding rock is occurred in the course of excavating of the large span subway station. It is essential to adopt informatization construction method while excavating this kind of subway station. To ensure the safety of the station, dynamic construction is needed, we should take response action in time, according to the mechanics condition of surrounding rock.
出处 《铁道建筑技术》 2006年第2期26-28,共3页 Railway Construction Technology
关键词 隧道群 超近距 暗挖施工 监测 tunnel group ultra-short distance subsurface excavated construction monitor
  • 相关文献

参考文献1

  • 1GB50299-1999.地下铁道工程施工及验收规范.[S].,..

共引文献3

同被引文献56

引证文献7

二级引证文献56

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部