盾构隧道穿越广州火车站站场的设计与施工 被引量:31

Design and construction of shield driven tunnel crossing the station yard of Guangzhou Railway Station
在线阅读 下载PDF
导出
摘要 广州地铁二号线火车站—三元里区间隧道中约165m长隧道要下穿京广铁路广州火车站站场,在没有采用地层加固和扣轨辅助方法的情况下,利用盾构工法安全、顺利地完成了穿越14股轨道及其站场站台、地下邮政通道与人行天桥的隧道施工,确保了京广线的正常运营并有效地保护了周边环境。文章对盾构隧道穿越站场地段的工程设计和施工技术进行了分析和论述,其中一些成功的经验可供类似工程参考。 A 165m section of shield driven tunnel from Guangzhou Railway Station to Sanyuanli of Guangzhou Metro line 2 underpasses the station yard of Guangzhou Railway Station. With a shield machine, 14 railway tracks, platforms, underground post passage and the foundation of pedestrian overpass bridge have been passed safely, without any auxiliary measure of ground consolidation and rail fastening. The successful construction of this 160 m long section under the station yard guarantees the normal operation of Beijing - Guangzhou Railway and protects the surrounding environment effectively. This paper introduces the successful experience of construction for the reference of similar projects.
作者 洪开荣
出处 《现代隧道技术》 EI 2002年第6期34-37,共4页 Modern Tunnelling Technology
关键词 火车站 站场 设计 盾构隧道 施工技术 同步注浆 环境影响 广州市 地铁隧道 Shield driven tunnel Construction technology Simultaneous grouting Environmental impact
  • 相关文献

参考文献3

  • 1B. Maidl, M. Herrenknecht, L. Anheuser. Mechanised Shield Tunneling. Berlin: Emst&sohn, 1996
  • 2日本隧道盾构新技术.武汉:华中理工大学出版社,1999-07
  • 3GB50299-1999.地下铁道工程施工及验收规范.[S].,..

共引文献3

同被引文献186

引证文献31

二级引证文献425

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部