5KHARE R, CHRISTIE R D. Prioritizing emergency control problems with fuzzy set theory. IEEE Trans on Power Systems,1997, 12(3): 1237-1244.
6ZHANG Y, WEHENKEL L, PAVELLA M. A method for real-time transient stability emergency control// Proceeding of IFAC/CIGRE 1997 Symposium on Control of Power Systems and Power Plants, Aug 18-21, 1997, Beijing, China. 1997:673-678.
7HALEVI Y, KOTTICK D. Optimization of load shedding schedules. IEEE Trans on Energy Conversion, 1993, 8 (2):207-213.
8MORROW D J, FOX B, TONER P T. Low-cost under frequency relay for distributed load shedding// Proceedings of the 3rd IEE International Conference on Power System Monitoring and Control, Jun 26-28, 1991, London, UK.Stevenage, UK: IEE, 1991: 273-275.
9NIRENBERG S A, MCININIS D S, SPARKS K D. Fast acting load shedding. IEEE Trans on Power Systems, 1992, 7(2): 873-877.
10VU K, EBOVIC M M, NOVOSEL D. Grids get smart protection and control. IEEE Computer Applications in Power,1997, 10(4): 40-44.